Easley Stormwater Management

Click for Easley, South Carolina Forecast

Construction Site Run-Off Control

Back Up Next

Construction Site Run-Off Control

Regulated municipalities must have a regulatory mechanism in place for erosion and sediment control as well as BMPs for preventing or reducing other pollutants associated with construction activity. It is important to note that this measure does not relieve the requirements of a construction-site operator to obtain an independent National Pollutant Discharge Elimination System (NPDES) permit for sites larger than 1 acre. The permitting authority, however, can specifically reference qualifying local programs in the NPDES general permit requirements so the construction operator doesn't need to follow two different sets of requirements.

574k PDF Silt Fence Barrier Reference Guide
245k PDF MCM - Construction Site Run-Off Control

 

 

Join the City's Email List
Email:  
For Email Newsletters you can trust

Easley City Hall
205 N 1st St Easley, SC, US
Phone: (864) 855-7900 Email Us

Mailing Address: PO BOX 466, EASLEY SC  29641-0466
Office Hours are 8:30am - 5pm EST Monday - Friday

© 2007-2009 The City of Easley, SC  All rights reserved.

Web Network by Aletheia Web Design